St Paul’s Catholic Primary School

st pauls stage 2

St Paul’s Catholic Primary School, Camden  
Stage 1, 2 and 3  – Refurbishment of existing classroom spaces    

Project Value $1,485,614.00

Stage 1

The scope of work included, but is not limited to the demolition of existing ceilings, carpet finishes, joinery items and existing partitions. Also the removal of existing windows 7 of to Block 2-SE & 7 of to Block 1-NW. Removal of existing projector and to retained to be fitted in new location. Disconnection of existing services.

The main construction phase consisted of new partition walls, glazed partitions and ceilings, installation of new joinery items, relocate existing services, install new masonry infills, install new windows, entry door in new location, cavity sliding doors and lotus sliding doors, paint finishes and carpet finishes. Put existing projector back in new specified location as per documentation.

Stage 2

The demolition scope for both Blocks 1 and 2 includes the removal of existing ceilings, floor finishes, joinery items and partition walls. Two existing windows and the brickwork below are to be saw cut and removed. Existing hydraulic fittings will be capped off.

The construction refurbishment works include the erection of new plasterboard partition walls using a light weight steel stud system, suspended acoustic ceiling system, installation of new aluminum framed glazed assemblies and ‘Lotus’ and cavity sliding doors. New joinery will be installed and specified walls are to be lined with Autex acoustic pin board linings, with the other walls to be finished with paint. New carpet tiles will be installed to designed layout.

Stage 3

The demolition scope includes the removal of existing ceilings, floor finishes, joinery items and partition walls. Specified existing windows and doors are to cut and removed to allow for replacements. Existing hydraulic fittings will be capped off.

The refurbishment works include the erection of new plasterboard partition walls using a light weight steel stud system, suspended acoustic ceiling system, installation of new aluminium framed glazed assemblies,  Lotus and cavity sliding doors. New joinery will be installed and walls are to be fitted with Autex acoustic pin board linings, with the other walls to be finished with paint. New carpet tiles will be installed to designed layout.